AT-6 plant installation in Jelgava

The customer wanted to rebuild an existing ring-shaft well that regularly filled up with groundwater in spring and autumn.

To stop the well filling with groundwater, an AT-6 wastewater treatment plant with a cone lid was installed inside the existing ring shaft. The treated water is pumped through a pumping station into the ditch next to the house.

If the well on your property fills up with groundwater, get in touch!