We have delivered more than 3,000 treatment plants and installations on the Latvian market. Take a look at some of our completed projects.

  • AUGUST AT-20 for a future guesthouse in Ventspils municipality: when an old inn comes back to life.

    AUGUST AT-20 for a future guesthouse in Ventspils municipality: when an old inn comes back to life.

    History meets modern technology

    It’s not every day we get to take part in a project where new technology gives a second life to a historic building. An interesting project is under way in Ventspils municipality – an old inn that will in time become a guesthouse. The restoration of the building is still ongoing, but the foundations of the infrastructure are being laid now, and the guesthouse’s sewerage solution is one of the things that has to be ready before the rest of the work is finished.

    For this site we installed an AUGUST AT-20 – one of the most powerful models in the AUGUST biological treatment plant range, designed for sites with a significantly larger volume of wastewater than an ordinary private house.

    Why is the AT-20 the right sewerage solution for a guesthouse?

    For a private house with 4–6 residents, an AT-6 or AT-8 model is usually enough, including the popular AT-8K version with a cone lid. But a guesthouse is different – you have to plan for a variable and significantly larger load:

    • guests arriving in groups or on holiday weekends;
    • possibly a restaurant or cafĆ© that also serves local residents;
    • staff who are on site every day regardless of the number of guests.

    The AUGUST AT-20 is a certified plant with a capacity of 18 PE (population equivalent), which means it can safely handle the kind of load expected in a medium-sized guesthouse or restaurant. In addition, like all AUGUST series plants, it is sized with a threefold safety margin – the plant’s real capacity is three times the calculated daily load. This means that even in a busy season or during a short-term overload (such as a wedding or a larger event), the plant keeps working reliably without any drop in treatment quality.

    What this means in practice

    By choosing the right plant size at the design stage, the owner doesn’t have to revisit the issue once the guesthouse is running at full capacity. It’s one of those things best done once and done right: just like the roof or the foundations, the guesthouse’s sewerage solution is the part of the infrastructure that stays below the surface, yet everything else depends on it.

    The AT-20, like the whole AUGUST AT series, is made of durable polypropylene with reinforcing rings for longevity, and its treatment efficiency is certified to the European standard EN 12566-3+A2 (PIA GmbH, Germany), with treatment results among the highest on the Latvian market.

    Historic sites need a careful approach

    Restoration projects for old buildings often involve special conditions: historic terrain, limited access for machinery, and the need to coordinate the work with other restoration processes. Each such site needs an individual approach from the very first consultation: choosing the right model, determining the installation option (above ground, partly buried, or under a road/yard surface) and close cooperation with the other contractors on the project.

    This project is still ongoing, and we look forward to following its progress as the old inn gradually becomes a place where guests will one day enjoy Kurzeme hospitality, knowing that everything happening ā€œbehind the scenesā€ works the way it should.

    AUGUST plant side view

    AT-20

    • 7–18 permanent residents
    • Up to 2.7 m³ of treated household wastewater per day.

    An eco-friendly and reliable solution for private houses and summer cottages. The AT-20 model is designed for 7 to 18 people and can treat up to 2.7 m³ of household wastewater per day. AUGUST plants deliver high treatment efficiency and low running costs, and come with a 10-year manufacturer warranty.

    4800 €

  • AUGUST AT-8K installation in Bauska: a sewerage solution for a private house without a central sewer

    AUGUST AT-8K installation in Bauska: a sewerage solution for a private house without a central sewer

    In Bauska municipality we completed another site where the homeowner chose an AUGUST AT-8K biological wastewater treatment plant. Below we show how the installation went and why this model fits best in a well-kept yard.

    Why the customer chose the ATK series

    The ATK series is the first wastewater treatment plant in Latvia in which the compressor and controller can be integrated into the plant itself. That means fewer lids in the yard and a cleaner landscape.

    A standard plant lid is 140 cm in diameter. The ATK lid is more than twice as small – just 60 cm. Such a small lid is easy to hide behind flower pots or ground-cover plants, and it doesn’t get in the way of mowing with either a traditional or a robotic mower. At the same time, access to the plant for maintenance remains completely convenient.

    The AT-8K is suitable for a household of up to 6 people and has a daily capacity of 0.90 m³ of wastewater. That’s roughly three times what an average family of four uses, so the plant always has a safety margin for guests, parties or a big laundry day.

    How the installation in Bauska went

    • Marking out the location.
    • Digging the trench and pit.
    • Laying the concrete base.
    • Lowering the plant into the pit.
    • Checking the level.
    • Connecting and backfilling.
    • Start-up.

    What the owner gets

    • Certified treatment quality. The AUGUST AT series has been tested at the PIA GmbH laboratory in Germany to EN 12566-3+A2: BODā‚… removal 98.2%, ammonium nitrogen 99.5%.
    • Low running costs. Average power consumption in STANDARD mode is 0.80 kWh per day.
    • Water for the garden. The treated, technically clean water is suitable for infiltration into the ground or for watering.
    • 10-year manufacturer warranty on the tank.
    • Service across Latvia. Annual maintenance is carried out by our certified specialists – the owner doesn’t have to do anything.

    We work throughout Bauska municipality

    We provide wastewater treatment plant installation, design and service in Bauska and the surrounding area: Iecava, Vecumnieki, Code, Īslīce, Mežotne, Rundāle and Skaistkalne. In Bauska municipality many private houses are outside the central sewer area, so a biological treatment plant is often the only compliant solution.

    AT-8K

    AT-8K

    • 2–6 permanent residents
    • Up to 0.9 m³ of treated household wastewater per day.

    A model with a reduced lid – ideal when the top of the unit is partly or fully covered with soil. The AT-8K is designed for 2 to 6 people and can treat up to 0.9 m³ of household wastewater per day.

    1950 €
  • AT-10 installation in Talsi

    AT-10 installation in Talsi

    In Talsi we installed an AT-10 biological wastewater treatment plant. This plant is designed for up to 8 permanent residents and can treat up to 1.2 m³ of wastewater per day.

    Main benefits of the AT-10:

    • high treatment efficiency and stable everyday operation;
    • simple operation and low running costs;
    • odour-free, with the option of control via the AUGUST control unit;
    • CE certification and up to a 10-year manufacturer warranty.

    If you need a reliable and eco-friendly solution for managing wastewater, get in touch.

  • AT-6 installation in Salaspils

    AT-6 installation in Salaspils

    The CE-certified AUGUST AT-6 biological wastewater treatment plant is suitable for households with up to 4 people living there every day. It is a compact, efficient and eco-friendly choice for both private houses and summer cottages. The AT-6 can treat up to 0.6 m³ of wastewater per day, providing high treatment quality in line with EU standards. The plant runs quietly, gives off no unpleasant odours and has low power consumption, making it a practical and cost-effective long-term solution. With simple maintenance, a modern control unit and a 10-year manufacturer warranty, the AT-6 is a reliable solution for households that value both comfort and care for nature.

  • AT-6 installation in SkrÄ«veri

    AT-6 installation in Skrīveri

    The AUGUST AT-6 is a CE-certified biological treatment plant suitable for households of up to 4 people. It is compact, efficient and ideal for both private houses and summer cottages.

    The AT-6 can treat up to 0.6 m³ of wastewater per day, providing high treatment quality that meets European Union requirements. The plant runs quietly, without odours and with low power consumption, making it a practical and cost-effective long-term choice.

    Simple maintenance, a modern control unit and a 10-year manufacturer warranty make the AT-6 a reliable choice for any household that values comfort and a responsible attitude towards nature.

  • AT-8K installation in Tukums

    AT-8K installation in Tukums

    In Tukums we installed a modern, compact AT8K biological wastewater treatment plant. This plant is designed for up to 6 residents and can treat up to 0.9 cubic metres of wastewater per day.

    The AT8K offers high treatment efficiency, simple operation and minimal running costs. Its compact size makes it easy to fit into any yard while keeping the surroundings looking good.

    If you also need a reliable and eco-friendly solution for managing wastewater, get in touch.

    In Tukums we installed a modern, compact AT8K biological wastewater treatment plant. This plant is designed for up to 6 residents and can treat up to 0.9 cubic metres of wastewater per day.

  • AT-6K installation in Olaine

    AT-6K installation in Olaine

    In Olaine we installed a modern, compact AT6K biological wastewater treatment plant. This plant is designed for up to 4 residents and can treat up to 0.6 cubic metres of wastewater per day.

    The AT6K offers high treatment efficiency, simple operation and minimal running costs. Its compact size makes it easy to fit into any yard while keeping the surroundings looking good.

    If you also need a reliable and eco-friendly solution for managing wastewater, get in touch.

  • 5 m³ holding tank installation

    5 m³ holding tank installation

    A full biological wastewater treatment plant is not always possible on a property. In such situations, a sealed holding tank is a suitable solution. This time we installed a 5 cubic metre holding tank, which provides safe and eco-friendly storage of wastewater until it is collected.

    The holding tank is fully sealed, resistant to deformation and fitted with a convenient access hatch for maintenance and pumping out. This solution is especially suitable for sites with limited space or difficult soil conditions.

    If you also need a reliable and safe solution for storing wastewater, get in touch.

  • AT-6 wastewater treatment plant installation in winter

    AT-6 wastewater treatment plant installation in winter

    A biological wastewater treatment plant can be installed in winter too. One such project was the installation of an AT-6 plant, designed for households of up to 4 people.

  • AT-6 plant with discharge to a ditch

    AT-6 plant with discharge to a ditch

    A biological wastewater treatment plant achieves up to 98% treatment, which makes the treated water clean enough to be safely discharged into the ground, reservoirs or surface waters. This household’s AT-6 wastewater treatment plant discharges the treated water into a ditch.

    If your property also has a ditch and you want your treatment plant to discharge treated water into it, fill in the form and we will get in touch!

  • AT-6 plant installation with a raised infiltration field

    AT-6 plant installation with a raised infiltration field

    High groundwater can cause all sorts of inconvenience, but in the hands of professionals it is quickly solved. This AT-6 wastewater treatment plant was installed in Mērsrags municipality. In addition to the plant, an infiltration field was built, but because of the high groundwater it had to be raised on a mound.

    If your household also has high groundwater that causes problems for your biological wastewater treatment plant, book a free consultation by filling in the form and we will get in touch!

  • AT-6 plant installation with a sewage pumping station and infiltration field

    AT-6 plant installation with a sewage pumping station and infiltration field

    In this project we installed an AT-6 plant, designed for up to 4 people, with a sewage pumping station and a raised infiltration field.

    During installation the groundwater was lowered so that the treatment plant could be installed safely.

    A concrete base was built under the plant, and the treatment plant is fixed to it with anchor bolts.

    The project also included rebuilding the sewer network and replacing the pipes, with an inspection chamber.
    Thanks to this, the customer no longer has to use holding tanks and the treatment plant can be conveniently serviced from the road side.

    If your property needs its sewerage rebuilt, book a consultation!