AT-8 installation under a roadway

The customer was not happy with how their existing treatment plant was working. So that the customer could keep using the existing area for parking, we installed the treatment plant under the roadway.

The AT-8 wastewater treatment plant was installed inside concrete rings. A new infiltration field was also built to receive the treated water from the plant. The AT-8 plant was installed in line with the regulations in Riga. It can treat up to 0.9 m³/day of wastewater.

Dismantling the old treatment plant and installing the new one took 2 working days.

If your property needs a wastewater treatment plant, book a free consultation.