AT-6 plant installation with a sewage pumping station and infiltration field

AUGUST AT-6 montaĢ„ža

In this project we installed an AT-6 plant, designed for up to 4 people, with a sewage pumping station and a raised infiltration field.

During installation the groundwater was lowered so that the treatment plant could be installed safely.

A concrete base was built under the plant, and the treatment plant is fixed to it with anchor bolts.

The project also included rebuilding the sewer network and replacing the pipes, with an inspection chamber.
Thanks to this, the customer no longer has to use holding tanks and the treatment plant can be conveniently serviced from the road side.

If your property needs its sewerage rebuilt, book a consultation!