A complete sewerage and water solution with an AUGUST AT-6 in Riga

pilns kanalizācijas un ūdens risinājums Rīgā

A customer in Riga wanted to sort out all their utilities in one project: build a sewer, set up stormwater drainage and connect the property to the central water main. Our task was to do it so that the customer didn’t have to get involved in the technical approvals and the work went smoothly: with a clear plan, timelines and commissioning.

Three systems in one project

We started with the water supply connection. We connected the property to the central water main, prepared the route, carried out the connection work and sorted out the paperwork. As a result, the customer has a stable, safe water supply that needs no extra attention day to day.

The next step was the sewerage. For this property we installed an AUGUST AT-6 biological treatment plant, designed for up to four permanent residents. This solution suits an urban setting, where you want a tidy system without odours and with clear maintenance requirements. For the plant to work reliably in the long term, a well-planned discharge solution and properly made connections are also essential.

The third part was the stormwater sewer. We built a system that collects rainwater from the roof and grounds and drains it away in a controlled manner, so the yard doesn’t turn into a puddle zone and the building’s foundations don’t suffer from excess moisture. In practice this means less risk of flooding after heavy downpours and a tidier site all year round.

Stress-free, with approvals and handover

The biggest benefit of a project like this is that all the systems are coordinated with each other during design and construction. This reduces the risk of later having to break up paving, move chambers or change gradients. For the customer it also means clear costs and one contact person to turn to both during construction and afterwards, if service is needed.

What the customer got

  • one responsible team for all utilities
  • approvals and paperwork handled by us
  • full construction and a properly commissioned site
  • a solution that remains clear and manageable after the work is done

Frequently asked questions

Can water, sewerage and a stormwater sewer be built at the same time?
Yes, and it is often better value, because the work is planned together and the pipe runs don't have to be redone several times.
Why choose a biological plant in the city?
If a central sewer is not available or a connection is not practical, a biological plant gives you a modern solution with predictable maintenance costs.
Is getting approval from Rīgas ūdens complicated?
The main thing is correctly prepared documents and proper execution.