ATO-100 treatment plant installation

AUGUST ATO-100 montaĢ„ža

In 2022 we completed one of the year’s largest treatment plant projects. We installed an ATO-100 wastewater treatment plant, designed for 100 people. The ATO-100 has a maximum load of 15 m³/day.

The new plant was installed in place of the old treatment plant. The existing treatment system was dismantled and the new ATO-100 wastewater treatment plant was built. The plant’s base was concreted before it was lowered into place. The treated water is discharged into the existing land drainage ditch.