Completed projects

We have delivered more than 3,000 treatment plants and installations on the Latvian market. Take a look at some of our completed projects.

  • AT-10 plant with an infiltration field

    AT-10 plant with an infiltration field

    The AT-10 wastewater treatment plant is designed for up to 8 people. The plant was installed for staff rest containers on an industrial site. The AT-10 treatment plant was built in a location with poor soil and high groundwater.

    The sewerage system was built according to the design prepared by the customer and, once the work was complete, approved by the building authority.

    Book a free consultation so we can get in touch and find the right solution for your sewerage system!

  • ATO-100 treatment plant installation

    ATO-100 treatment plant installation

    In 2022 we completed one of the year’s largest treatment plant projects. We installed an ATO-100 wastewater treatment plant, designed for 100 people. The ATO-100 has a maximum load of 15 m³/day.

    The new plant was installed in place of the old treatment plant. The existing treatment system was dismantled and the new ATO-100 wastewater treatment plant was built. The plant’s base was concreted before it was lowered into place. The treated water is discharged into the existing land drainage ditch.

  • AT-8 installation under a roadway

    AT-8 installation under a roadway

    The customer was not happy with how their existing treatment plant was working. So that the customer could keep using the existing area for parking, we installed the treatment plant under the roadway.

    The AT-8 wastewater treatment plant was installed inside concrete rings. A new infiltration field was also built to receive the treated water from the plant. The AT-8 plant was installed in line with the regulations in Riga. It can treat up to 0.9 m³/day of wastewater.

    Dismantling the old treatment plant and installing the new one took 2 working days.

    If your property needs a wastewater treatment plant, book a free consultation.

  • AT-6 plant installation in Jelgava

    AT-6 plant installation in Jelgava

    The customer wanted to rebuild an existing ring-shaft well that regularly filled up with groundwater in spring and autumn.

    To stop the well filling with groundwater, an AT-6 wastewater treatment plant with a cone lid was installed inside the existing ring shaft. The treated water is pumped through a pumping station into the ditch next to the house.

    If the well on your property fills up with groundwater, get in touch!

  • AT-8 treatment plant with a lockable cone lid in Piņķi

    AT-8 treatment plant with a lockable cone lid in Piņķi

    A site in Piņķi. An AT-8 treatment plant was installed with a lockable cone lid of a smaller diameter. Because of high groundwater, the treatment plant was installed using a dewatering system. A pumping station was installed after the plant, and an infiltration field was built above the groundwater.

    Book a free consultation on treatment plants here

  • AT-8 plant installation with discharge to a ditch in Ä¢ipka

    AT-8 plant installation with discharge to a ditch in Ģipka

    A site in Ģipka

    An AT-8 plant was installed with discharge to a ditch. The treatment plant was built in a location with high groundwater, so a dewatering system was used for the installation. The plant is anchored to a concrete base, which protects it from the effects of groundwater.